Inventory ordering cost (S)
Ordering cost S is the fixed cost incurred per order regardless of order size. It includes PO admin labour, receiving, inspection, and payment processing. Typical SMB range is $50 to $300 per PO; EDI and automated supplier portals drive the bottom of the range, manual purchasing the top[1].
Fixed cost per order, independent of order quantity Q.
Components
- PO admin: buyer time to draft, approve, send a PO. For SMBs with a part-time purchasing role, $15 to $40 per PO.
- Receiving: labour to unload, check against PO, put-away. Often the biggest piece for warehoused goods.
- Inspection: quality inspection if applicable. Typically $0 for COTS goods, $50+ for fabricated parts.
- Payment processing: AP labour, bank fees on international wires.
Why S is independent of Q
Drafting a PO for 100 units takes the same buyer time as drafting one for 1,000. Receiving a single pallet takes about the same time as a stack-of-pallets receipt. This is the assumption that makes (D/Q)*S the right total-cost-of-ordering term: the fixed cost per order, multiplied by the number of orders per year[2].
S in manufacturing context: setup cost
In EPQ, S is called "setup cost" rather than "order cost." It captures changeover labour, scrap during ramp, and first-article inspection. Identical math; the Toyota Production System made cutting S the central focus of process improvement (SMED), which compounds: Q* shrinks with sqrt(S), so cutting S by a factor of 16 cuts Q* by 4.